$16.1-million capital budget targets aging infrastructure

Flashy mega-projects are taking a back seat this year as the municipality focuses its financial resources on fixing what is already broken.

Passed alongside the operating finances, the town’s new $16.1-million capital budget leans heavily into essential engineering, underground utilities, road repairs, and modernizing emergency services equipment. The spending plan reflects a deliberate, back-to-basics approach to asset management, shifting away from new building announcements to focus strictly on maintaining aging infrastructure.

“We are not building for headlines,” Mayor Francesca Ward told council. “We’re building for reliability. We need roads that work, water that runs, and a town that functions the way it’s supposed to, and our job here is to make sure that’s exactly what you get.”

A major piece of that reliability puzzle is the deteriorating road network. To address the issue, the budget introduces a brand new $1-million street overlay program. This “mill and fill” initiative is designed to proactively scrape away damaged asphalt and lay down a fresh surface, starting largely along Caribou Trail. The goal is to catch the wear and tear early and save the roads before they deteriorate to the point of requiring a much more expensive full-scale reconstruction.

Heavier infrastructure projects also make up a massive chunk of the newly approved spending. The capital budget sets aside $1.8 million for a major rehabilitation of 5th Street NW. It also allocates a staggering $3 million for the complete replacement of Lift Station D, a critical component of the wastewater pumping system that has operated far beyond its expected service life.

While roads and underground pipes are getting millions of dollars in attention, pedestrian safety is also on the books, though with a much smaller footprint. The capital plan dedicates $150,000 for sidewalk rehabilitation and another $100,000 to tackle required bridge repairs and replacements. Given that cracked and uneven sidewalks remain a consistent priority for pedestrian safety, these lower allocations could spark future community discussions on whether more aggressive funding is required to keep walkways safe and accessible for all residents.

Beyond roads and pipes, emergency services are seeing significant financial investments to replace aging fleets and keep first responders equipped. According to the town’s chief financial officer, a brand new fire engine is slated to be picked up within the next month. The budget also features a $3.1-million carry-forward from the previous year to finally purchase a highly anticipated fire ladder truck, which is scheduled for 2028.

The town is also funding several community-focused upgrades. These include energy efficiency improvements at the Multi Rec Centre, and $250,000 to completely resurface the pool basin at the Northern Lakes College aquatic centre to stop leaks and restore safe operations.

Funding for the entire capital plan is being pieced together through a combination of municipal reserves, provincial and federal grants, and debentures, allowing the town to spread the heavy costs over multiple years to ensure financial sustainability.

Armaan Khanna
Local Journalism Initiative Reporter

Share this post

Post Comment